Landing Helicopter Dock Vessel Shore Power Upgrade

McKay was contracted by BAE Systems for the design, supply and installation of the electrical equipment for the upgrade, which included:

  • Replacing the existing four shore power boxes with four new larger capacity units
  • Upgrading the existing main power distribution system to support the capacity increase
  • Installation of six new shore connection panels
  • Supply and installation on DC part upgrades

For this project it was very important that we properly meet the needs of our clients. They had been unhappy with the existing design solution provided to them from another electrical service provider, and so it was imperative that we go above and beyond to provide a replacement design solution that fit the needs of the vessels the shore power boxes are meant to serve. This focus on making sure our client’s businesses run smoothly is at the core of what makes the project we undertake so successful.